On achieving
productivity higher than the benchmark level of productivity per gang/shift prescribed
in the schedule |
Rebate on the rate
prescribed in the above schedule if the productivity achieved is higher than the benchmark productivity per gang/shift
(in %) |
On achieving
productivity lower than the benchmark level of productivity per gang/shift prescribed in the schedule |
Penalty on the rate
prescribed in the above schedule if productivity is lower than the benchmark
productivity per gang/shift
(in %) |